{"id":2161,"date":"2021-07-01T19:57:29","date_gmt":"2021-07-01T19:57:29","guid":{"rendered":"https:\/\/www.esbgroup.it\/non-categorizzato\/superbonus-110-primo-cantiere-portato-a-termine-in-italia\/"},"modified":"2024-03-29T22:54:40","modified_gmt":"2024-03-29T22:54:40","slug":"superbonus-110-first-construction-site-completed-in-italy","status":"publish","type":"post","link":"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/","title":{"rendered":"Superbonus 110%, first construction site completed in Italy"},"content":{"rendered":"<p><strong>8 million euros<\/strong> of intervention, at least<strong> 53 people at work per day<\/strong> (with peaks of 80 units) for <strong>295 days<\/strong>. These are some of the figures that give the La Playa 1 condominium in<strong> San Salvo Marina<\/strong> a national record: that of the first construction site to be completed that benefited from the earthquake bonus and the 110% eco bonus.<\/p>\n<p>The president of <strong>ANCE Abruzzo<\/strong> (National Association of Building Contractors) <strong>Antonio D&#8217;Intino<\/strong> confirmed it this morning and stressed how the project is a pilot case in Italy and that &#8220;new apartments have been created for the condominiums without costs for them and on which there won&#8217;t be any need to intervene again for the next 30 years&#8221;. Of over 5600 practices started in Italy (the data cited are from Sole 24 Ore), around 80 are in an advanced stage and that of San Salvo Marina is the only one concluded with the combination of <strong>seismic improvement<\/strong> (earthquake bonus) and <strong>energy efficiency<\/strong> ( 110% bonus).<\/p>\n<p>The intervention involved one of the buildings that characterise the San Salvo marina close to the tourist port. These are two twin condominiums with over 40 apartments each and several commercial premises whose project dates back to <strong>August 1967<\/strong>. The works concerned the first complex, the one closest to <strong>Via Doria<\/strong>.<br \/>\nThe team from San Salvo, made up of <strong>Strever spa<\/strong>, the design studio <strong>Newark Engineering<\/strong>, the tax consultancy firm <strong>Boschetti<\/strong> and <strong>Intensa San Paolo<\/strong> as a banking institution for the transfer of credit, were present at the event today.<\/p>\n<p>The actors in this affair retraced the difficult stages, especially from a bureaucratic point of view (the methods of access to bonuses, in particular the 110% bonus, have been at the centre of requests for simplification for some time) and planning starting from the resolution of the intervention in August 2021 at the condominium meeting, &#8220;The role of the administrator is fundamental in these practices&#8221;, the various speakers repeated several times. The structure showed the signs of time being one of the first to be built on the San Salve seafront, &#8220;It was not badly designed, but with the standards of the time which today are obsolete, for example there was no armor &#8211; specified Gennaro Luciano of the Newark showing explicit photos of the pre-intervention state \u2013 We thus did what we have been doing for some time in L&#8217;Aquila, the 40&#215;40 pillars became 80&#215;80 just to give an example. Aesthetics are important, but we were above all interested in returning a safe building.<br \/>\nLike much of the Abruzzo coast, here too many of the large buildings overlooking the sea are around 50 years old and the issue of restructuring, especially from a seismic point of view, is pressing, &#8220;Today in Italy we have the tools to not be afraid of <strong>earthquakes<\/strong>, perhaps they need to be refined, but the message needs to be &#8216;let&#8217;s use them&#8217;,\u201d Luciano added. Furthermore, a <strong>photovoltaic system<\/strong> has been installed on the building and the architectural barriers have been removed inside. At the end of the intervention, the <strong>energy certification<\/strong> went from class D to A2, while the <strong>seismic<\/strong> one from E to C.<\/p>\n<p>The president of Ance, D&#8217;Intino then added: &#8220;One euro that is invested in redevelopment interventions generates other 4 that circulate. Suffice it to say that this intervention has left <strong>3 million euros in the territory for the local workforce<\/strong>, also for this reason the energy efficiency and seismic safety of the country&#8217;s real estate assets can no longer be postponed&#8221;.<br \/>\nAlso present for the occasion the president of the Chieti-Pescara Chamber of Commerce, <strong>Gennaro Strever<\/strong>: &#8220;Woe to anyone who will take back the money made available by the European Union.&#8221;<\/p>\n<p>At the conclusion of the conference, the motivation for choosing the all-white also as a sign of rebirth: &#8220;It is the colour that preceded the Renaissance used immediately after the plague as well as marrying with the marine location&#8221;, explained <strong>Agostino Monteferrante<\/strong> of the design studio . The same intervention will also concern the twin building and the central body that once housed the Giardino Mare restaurant: it will start next September and end at the beginning of summer 2022.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>8 million euros of intervention, at least 53 people at work per day (with peaks of 80 units) for 295 days. These are some of the figures that give the La Playa 1 condominium in San Salvo Marina a national record: that of the first construction site to be completed that benefited from the earthquake&#8230;<\/p>\n","protected":false},"author":1,"featured_media":1732,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"iawp_total_views":7,"footnotes":""},"categories":[57],"tags":[58],"class_list":["post-2161","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en","tag-2023-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Superbonus 110%, first construction site completed in Italy - ESB Group<\/title>\n<meta name=\"description\" content=\"8 million euros of intervention, at least 53 people at work per day (with peaks of 80 units) for 295 days. These are some of the figures that give the La\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Superbonus 110%, first construction site completed in Italy - ESB Group\" \/>\n<meta property=\"og:description\" content=\"8 million euros of intervention, at least 53 people at work per day (with peaks of 80 units) for 295 days. These are some of the figures that give the La\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/\" \/>\n<meta property=\"og:site_name\" content=\"ESB Group\" \/>\n<meta property=\"article:published_time\" content=\"2021-07-01T19:57:29+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-03-29T22:54:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.esbgroup.it\/wp-content\/uploads\/2023\/10\/th-news4.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"544\" \/>\n\t<meta property=\"og:image:height\" content=\"338\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/\",\"url\":\"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/\",\"name\":\"Superbonus 110%, first construction site completed in Italy - ESB Group\",\"isPartOf\":{\"@id\":\"https:\/\/www.esbgroup.it\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.esbgroup.it\/wp-content\/uploads\/2023\/10\/th-news4.jpg\",\"datePublished\":\"2021-07-01T19:57:29+00:00\",\"dateModified\":\"2024-03-29T22:54:40+00:00\",\"author\":{\"@id\":\"https:\/\/www.esbgroup.it\/en\/#\/schema\/person\/b5af62d2c2b43dec94f04b2bbd8c9e9d\"},\"description\":\"8 million euros of intervention, at least 53 people at work per day (with peaks of 80 units) for 295 days. These are some of the figures that give the La\",\"breadcrumb\":{\"@id\":\"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/#primaryimage\",\"url\":\"https:\/\/www.esbgroup.it\/wp-content\/uploads\/2023\/10\/th-news4.jpg\",\"contentUrl\":\"https:\/\/www.esbgroup.it\/wp-content\/uploads\/2023\/10\/th-news4.jpg\",\"width\":544,\"height\":338},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.esbgroup.it\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Superbonus 110%, first construction site completed in Italy\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.esbgroup.it\/en\/#website\",\"url\":\"https:\/\/www.esbgroup.it\/en\/\",\"name\":\"ESB Group\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.esbgroup.it\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.esbgroup.it\/en\/#\/schema\/person\/b5af62d2c2b43dec94f04b2bbd8c9e9d\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esbgroup.it\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/ebef8e6da14437c1224c3956cde9ac84d41b1d9fecfb874e4c5aa01f143c1b75?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/ebef8e6da14437c1224c3956cde9ac84d41b1d9fecfb874e4c5aa01f143c1b75?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\/\/esb.icsadv.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Superbonus 110%, first construction site completed in Italy - ESB Group","description":"8 million euros of intervention, at least 53 people at work per day (with peaks of 80 units) for 295 days. These are some of the figures that give the La","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/","og_locale":"en_US","og_type":"article","og_title":"Superbonus 110%, first construction site completed in Italy - ESB Group","og_description":"8 million euros of intervention, at least 53 people at work per day (with peaks of 80 units) for 295 days. These are some of the figures that give the La","og_url":"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/","og_site_name":"ESB Group","article_published_time":"2021-07-01T19:57:29+00:00","article_modified_time":"2024-03-29T22:54:40+00:00","og_image":[{"width":544,"height":338,"url":"https:\/\/www.esbgroup.it\/wp-content\/uploads\/2023\/10\/th-news4.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/","url":"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/","name":"Superbonus 110%, first construction site completed in Italy - ESB Group","isPartOf":{"@id":"https:\/\/www.esbgroup.it\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/#primaryimage"},"image":{"@id":"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/#primaryimage"},"thumbnailUrl":"https:\/\/www.esbgroup.it\/wp-content\/uploads\/2023\/10\/th-news4.jpg","datePublished":"2021-07-01T19:57:29+00:00","dateModified":"2024-03-29T22:54:40+00:00","author":{"@id":"https:\/\/www.esbgroup.it\/en\/#\/schema\/person\/b5af62d2c2b43dec94f04b2bbd8c9e9d"},"description":"8 million euros of intervention, at least 53 people at work per day (with peaks of 80 units) for 295 days. These are some of the figures that give the La","breadcrumb":{"@id":"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/#primaryimage","url":"https:\/\/www.esbgroup.it\/wp-content\/uploads\/2023\/10\/th-news4.jpg","contentUrl":"https:\/\/www.esbgroup.it\/wp-content\/uploads\/2023\/10\/th-news4.jpg","width":544,"height":338},{"@type":"BreadcrumbList","@id":"https:\/\/www.esbgroup.it\/en\/news-en\/superbonus-110-first-construction-site-completed-in-italy\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.esbgroup.it\/en\/"},{"@type":"ListItem","position":2,"name":"Superbonus 110%, first construction site completed in Italy"}]},{"@type":"WebSite","@id":"https:\/\/www.esbgroup.it\/en\/#website","url":"https:\/\/www.esbgroup.it\/en\/","name":"ESB Group","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.esbgroup.it\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.esbgroup.it\/en\/#\/schema\/person\/b5af62d2c2b43dec94f04b2bbd8c9e9d","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esbgroup.it\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/ebef8e6da14437c1224c3956cde9ac84d41b1d9fecfb874e4c5aa01f143c1b75?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ebef8e6da14437c1224c3956cde9ac84d41b1d9fecfb874e4c5aa01f143c1b75?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/esb.icsadv.com"]}]}},"_links":{"self":[{"href":"https:\/\/www.esbgroup.it\/en\/wp-json\/wp\/v2\/posts\/2161","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esbgroup.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.esbgroup.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.esbgroup.it\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.esbgroup.it\/en\/wp-json\/wp\/v2\/comments?post=2161"}],"version-history":[{"count":2,"href":"https:\/\/www.esbgroup.it\/en\/wp-json\/wp\/v2\/posts\/2161\/revisions"}],"predecessor-version":[{"id":2163,"href":"https:\/\/www.esbgroup.it\/en\/wp-json\/wp\/v2\/posts\/2161\/revisions\/2163"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.esbgroup.it\/en\/wp-json\/wp\/v2\/media\/1732"}],"wp:attachment":[{"href":"https:\/\/www.esbgroup.it\/en\/wp-json\/wp\/v2\/media?parent=2161"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esbgroup.it\/en\/wp-json\/wp\/v2\/categories?post=2161"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esbgroup.it\/en\/wp-json\/wp\/v2\/tags?post=2161"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}